Highway Condition Survey - Riverside Lambeth, London
Case study

Highway Condition Survey - Riverside Lambeth, London

Mayer Brown was appointed to undertake a pre-construction highway condition survey around the Geoffrey Close Estate site at Riverside Lambeth.

Transport Planning
Infrastructure Design
Environmental Assessment

Details

Initial Details

The survey was required to provide an objective record of the existing condition of the adjacent public highway and footways before construction activity progressed and to support the highway-related requirements of the project's Section 106 Agreement.

Challenge

Construction activity can give rise to uncertainty over whether damage to the surrounding highway is pre-existing or has resulted from the works. A clear and auditable baseline was therefore needed to protect the interests of the client, contractor and highway authority, support compliance with the Section 106 requirement and provide a reliable basis for any later comparison or reinstatement discussion.

The survey also required careful coordination of the inspection limits and access arrangements so that the relevant carriageways, footways, kerbs and associated highway features could be recorded consistently and in sufficient detail.

Solution

Mayer Brown's highway engineers planned and completed a systematic visual inspection of the agreed survey area, following a logical route so that the condition record was complete, consistent and easy to review. Our role included:

  • Agreeing the survey limits and access arrangements with the highway authority, client and site team.
  • Inspecting the carriageways, footways, kerbs and other visible highway features within the agreed area.
  • Recording existing defects and areas of deterioration through a structured photographic record.
  • Numbering and locating photographs so that each observation could be readily traced on the survey plan.
  • Preparing a concise, professional report suitable for submission to the relevant authority.
  • Establishing a robust baseline to support any post-construction comparison, liability query or reinstatement discussion.

The completed report was issued to the Client for submission to the Council. It provided a clear and concise record of the surveyed highway and footways, reduced exposure to claims relating to pre-existing defects, supported the project's planning obligations and created a clear basis for any future post-construction survey.

Contact Details

For further information, please contact Adrian Barnley at abarnley@mayerbrown.co.uk.


Related content


Request callback

Please leave us your details and we will endeavour to call you back as soon as we can.

Request callback

Contact us for more information

Sign up to keep in touch

Visit our preference centre to sign up for our e-newsletter and update your preferences.

CQMS
Construction Line
ISO 9001
ISO 14001