The site is on the edge of the existing Waterlooville urban area, with a section of the River Wallington running through the site.
Mayer Brown has been involved in this project from its inception, through the planning and design stages, with ongoing construction supervision. The process has involved extensive liaison with Local Authorities, Highways Authorities, utility providers and local residents.
Mayer Brown has undertaken the design for the road network around the site, and linking it to existing roads and services. We have co-ordinated the utilities and drainage through the site bringing them to the development parcels.
The surface water drainage has been designed to enhance the amenity and ecology of the site, by providing open space attenuation features across the site as part of a site wide flood and surface water management strategy.
The supervision of strategic infrastructure works are part of the services Mayer Brown has provided.
The development of the site will be ongoing for a number of years, with Mayer Brown being retained by Grainger plc and many of the developers of the individual housing parcels as they become available.
There are many varied aspects to bring together throughout the project, co-ordinating between the client, consultants, council departments, suppliers and contractors, to provide a robust, elegant solution to the design that meets the requirements of our client, and provides a uplifting living environment for the new residents.
For further information please contact enquiry@mayerbrown.co.uk
Please leave us your details and we will endeavour to call you back as soon as we can.